With the change in weather over the last month from the relatively normal regular rain/storms of Summer and early Fall, I finally managed to complete the roof. While the studio portion of the roof had been 90% complete there was the 10% over the spinning loft area and the large portion over the utility room above the garage. It took 2 weeks of fairly long days to take down the tarps and replace with the shingle roof.
Once done I no longer have to get ready for any rain by positioning buckets at strategic spots and was able to complete the move of all the large looms from the house to studio. Five looms are on the studio floor at present and one (‘Senior’) is disassembled on a set of shelves as I gradually clean it up prior to re-assembly. We also moved a lot of the artwork and wall hangings from the original loom room and I’ve hung them on the exposed walls to add a little bit of color.
Still plenty of (now undercover) work on the Studio to do, but in the meantime work continues on the ‘Oak and Fern’ rugs and I’ve begun dressing the ‘Big Mac’ loom with warp for the Christmas towels.
